Part Number:TMS320F28032
Tool/software: Code Composer Studio
hi,
I'm a FAE in TI, My customer propose a new power project with Peak Current Control Mode, because the output current is big, they want to achieve two phase inverting parallel, input is 48V, output is 12V@100A
they are choosing two topology hard-switching Full Bridge and Phase shift Full Bridge, Do you have some comments and suggestions about peak current control?
Do you have some application notes and documents about achieving peak current control with C2000?
Thank you very much.